EPC

Our Project

Engineering Consulting

Engineering consulting makes clients have a comprehensive understanding of the value of mine, the useful elements, available mineral Processing technology, plant size, required equipment and period.…

Installation And Commission

installation and commission is key link of realizing dressing test, mine design, and equipment manufacture, and directly takes influence on production.…

Mine Design

The key of mine design is all must be established on the basis of detailed investigation, and therefore Xinhai Mine Design Institute will firstly take a comprehensive field study to the mine of clients including the crude ore for dressing plant, site, water, electricity, traffic,…

Mineral Dressing Test

The clients should provide about 50g representative samples, some special samples about 200~1000g. The simple test needs 30 working days, and the detailed test about half a year.…

Equipment Manufacture

Equipment manufacture is in the charge of Xinhai mine production plants that covers an area of 100 mu, and are divided into 3 production plants. It could manufacture more than 600 kinds of equipment of mining, ore dressing and metallurgy, and provides full sets of main and auxiliary…

Designed Capacity Reached

The target reached of Xinhai EPC includes expected recovery rate reached, design capacity for clients reached, the quality of product reached, consumption indicators meeting requirement, effective controlling of production cost and the stable operation of process and equipment.…

Personnel Training

It is simultaneous for worker training and installation and commission in order to save time and cost. Worker training has two purposes, one is the dressing plant works earlier and produces benefit, the other is training technical team for customers to guarantee the normal operation…

Solutions

  • Tailings processing technology

Products